Week 14 saw the insulation put into the wall and also some of the walls are now sheeted. In this first photo you can see the insulation in the walls of the master bedroom and if you look to the left of the photo you can see the walls of the walk in wardrobe have been sheeted with Gyprock.

In this photo you can see the wall sheeting of bedroom 2.

and in the third photo this week you can see the sound proofing in the theatre, it looks much the same as the insulation but is a heavy material which will hopefully keep the sound in the theatre and not booming throughout the rest of the house.