![]() |
| Home |
Week 12 saw the brick work 95% finished. The front door is now on the house, the bath tub is in and I am locked out. As some of the internal stuff is now happening the doors are all locked. Hopefully the builder will give me a key. This is a photo of the front of the house
The next photo is of the front door
and this is a photo from behind the house
|
||||||||||||||||||||||||