Week Ten, there were no major changes to the house, the main fuse box was installed and also some plumbing work was completed. The Garage is now 95% finished, there is a toilet to be fitted inside and also the downpipes need to be connected to the rain water tank (which is not on site yet)
and from the back, we put a roller door on the back of the shed for easy access to the garden, also we will be able to drive the cars out the back so we can wash them on the grass and get double use of the already recycled water.
and a third photo this week, the shed from the inside.
|
||||||||||||||||||||||||